Masons
The masons have begun with their phase of the project. Bricks will begin to be laid along all the walls on the east half of the building. Before the work begins, a massive structure will have to be erected. The Scaffolding.
Scaffolding getting ready to be set along the north wall.
going up.
...and up.
...and up. Once the back concrete is poured, this machine will be able to run to the back and bring in our bricks.
For now, the beast lies in wait. Pouring should happen on 7/27.