STEEL

Today, we got the steel. It was amazing to see the crane blocking up a fraction of the street. They needed to lift the big pieces up and over, and hold them in place while the attached the lower supports. 

IMG_1701.JPG

Two blocks away, you could see the work going on.  

Eventually, a crane will appear inside the building, but we did have to disrupt a little traffic flow today. 

Eventually, a crane will appear inside the building, but we did have to disrupt a little traffic flow today. 

They began tearing down the support beams that we've left in place from the original structure. The first steps are replacing these supports in order to protect that wall.  

They began tearing down the support beams that we've left in place from the original structure. The first steps are replacing these supports in order to protect that wall.  

IMG_1713.PNG

New supports laid across the front. As they were installing, one piece turned up a little short, so it had to go back to the factory. Should arrive in about two days. No worries though, the work continued around it. There's a LOT more to come with this. We are building the skeleton of the CML. 

Previous
Previous

Masons

Next
Next

The Stage