Since You’ve Been Gone
Oh man... it’s been a while since I updated the blog. So much has been happening with the site, that it’s hard to keep up. Over the past month we’ve gotten all our walls, kitchen equipment, elevated seating, ceilings, light trims... we are only 3 weeks out to completion, so everything is coming to a head.
Here’s a look at some of the photos over the last few weeks.
We have our banquette levels built up and concreted in place.
The library is being installed.
Kitchen is wrapped up.
Bar banquette is placed.
The 654 Club is ready for carpet.
Our “Twin Peaks” bathroom floor.
Railing and primered paint on the mezzanine.
And our top floor siding and my window is in!
so much more to come, and only 3 more weeks of heavy duty work to go. Please keep checking back, I promise to keep you all updated.
-Joey C.